We have been busy replacing some bad cart paths. Dobsch Construction is doing an outstanding job. All sod work is being done by my staff. So far we have done #18 from top of hill all the way to green. #1 bad spots coming up to green and then around curve up behind green. #15 at the bottle neck no more dip in path. We still have to do #5 green, "#12 cart path up by 13 white tee and the rest of #18 and the cart path down to #9 green and #7 tees. We are not going to stop with these paths I hope to add more. I am looking at fixing #7 path from bridge to 8 tees and replacing # 8 path all the way to new path at green. Our goal is to take out all the old 5 foot wide paths and replace with 6 foot. Most of our 5 foot paths are on the back nine which is the hardest paths to access with concrete. Here are a few picture of our work.