It is that time of year. With the bitter cold temperatures the ground has frozen solid. Later in the week we will have temperatures climb up to near 50 degrees. Greens need to thaw to at least 2'' before play is allowed. The green surface needs sunlight to help in the thawing process. Snow cover will slow this process up. When snow melts we will be checking greens multiple times a day when we have at least 2'' of thaw in all our greens we will open. Root shearing can cause severe turfgrass problems. Diagram below show how root shearing is done by playing on thawing greens. Thanks for your cooperation.
Wednesday, February 17, 2021
Tuesday, February 16, 2021
Tree work
We have been very busy working on underbrush and tree removal the past 2 months. We started with underbrush to the east side of 10 green and worked our way down the fence to 12 black tee. Air movement is what we are trying to enhance on 10 and 11 greens. The next thing was to remove 10 trees around 10 green. This will help with light, air movement and help establish much better turf on the back side of 10 green. We will be removing 4 trees to the south and east of 11 green also. These trees are shading 11 green. All trees removed were trees selected by the USGA Agronomist John Daniels during his visit last summer. There are 2 trees at #11 we are cutting down because they are leaning heavy over the fence. If they fall it will destroy the fence giving the cattle access to the golf course.
Some of the trees removed from #10 were in bad shape. We cut two trees down that were hollow. the picture below is the tree that was right next to cart path leaving 10 green. After we remove the stumps we are going to grade and sod both sides of cart path behind 10 green. This will be a huge improvement. Trees will not allow good turf to grow under them. Below are some pictures of both 10 and 11.
Friday, October 16, 2020
Course Update
It has been awhile since my last post. We have been very busy. We have a number of project that have been completed. One of the biggest accomplishments is our greens are almost healed up from the Nematode and Root Rot issues from July. This was the hardest summer I have ever had in my 35 years as a Golf Course Superintendent. I am optimistic this will not happen again. I have a different approach for next year. I am build my soil biology up with biological products that will grow greater root mass in our greens and have a negative effect on Nematodes. Some of these biological product are in fact natural Nematicides. I have always used biologicals but not to this extreme. Some of these products like crab shell meal, soap box tree extract, compost, sesame seed oil all have some degree of control to Nematodes. I am also using some forms of Bacteria and Fungi products that also have control against Nematodes. I know I will not kill all of them but if I can keep numbers low enough to get our greens through July and August with minimal damage that is a win.
Here are the list of project we completed since August.
- #4 fairway bunker was rebuilt.
- #8 cart path from ditch in front of green up past merge from #17 was fixed.
- #1 trees to north of green were removed to help with turf loss on right side of green below bunker.
- Aerified all greens.
- DryJect all greens.
- Fixed cart path washouts on holes 6 and 12.
- Sprayed second application of Bermuda grass control on fairways and tees.
- Fix sink hole that developed at the front entrance from bad culverts.